All case studies

Taking the risk out of material choices on a new product launch

An established UK manufacturer of heating systems, launching a new product range.

  • Heating, ventilation and air conditioning
  • New product introduction
  • Material selection
  • Quality and compliance
New rangeNo existing specification or supplier to copy
4 testsUV, heat, impact and chemical resistance assessed per component
7 figuresAnnual relationship today

The challenge

The customer was developing a new product range that needed multiple plastic components for both internal and external use. Because the products were new, there was no existing material specification and no incumbent supplier to copy.

Each component faced a different mix of UV exposure, heat, impact and chemical contact, and parts made from different polymers had to sit side by side and still look the same. The wrong material choice risked early failure, colour mismatch and an inconsistent finish on the launched product.

What MMS did

  • Mapped the operating environment of every component, inside and outside the unit
  • Reviewed suitable material options against UV, heat, impact and chemical-resistance requirements
  • Advised on finish and colour so different polymers matched across the finished product
  • Acted as the technical and commercial link between the customer’s engineers and the manufacturing partner
  • Secured informed material and finish decisions before production started, not after

The result

The customer launched the new range with materials chosen for each component’s real operating conditions, reducing the technical risk of the launch and giving the business confidence that every component would perform and look consistent.

How the relationship grew

What began as one new product range is now a seven-figure annual relationship covering a wider range of products and sourcing requirements.

Launching a new product without a proven specification? Talk to us before you commit to production.

More case studies

Quarrying, crushing and screening

One partner for 25 bespoke parts on a new flagship machine

An aggregates equipment manufacturer saved 20% and gained three-day local supply after MMS managed 25 bespoke parts for a new flagship machine.

  • Supplier qualification
  • Quality and compliance
  • Logistics and customs
  • Local stockholding

Medical equipment

Securing supply through a period of rapid growth

A healthcare equipment manufacturer kept production running through rapid growth with a flexible four-month stock buffer held by MMS.

  • Supply continuity
  • Local stockholding

Infrastructure and utilities

From five-month lead times to three-day call-off

An infrastructure products manufacturer cut lead times from five months to three days and saved 20% by moving overseas steel supply to MMS.

  • Supplier management
  • Quality and compliance
  • Logistics and customs
  • Local stockholding